Location: Vasiliko, VTTV Facilities
Project Owner: VTT Vasiliko Ltd
Contractor: J&P and J&P (O) – Vasiliko Oil Tank JV
From June 2012 until October 2014, our company undertook the sealing of the bearing surfaces of the Fuel Tanks as well as the surrounding area of the fuel tanks. HDPE membrane 1.5mm and 2mm thick was placed with a total surface of 57000 m2.